GE ZSC1201SS Oven User Manual


 
Installation Preparation
6
Preparation WITHOUT an Accessory Storage Drawer
PREPARE THE OPENING (cont.)
Installation over a GE/Monogram Oven and
Warming Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location
do not obstruct the required interior depth
and height. See Warming Drawer installation
instructions for details.
CAUTION: For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate 80-pound oven, plus
additional oven loads of up to 50 pounds
or a total weight of 130 pounds.
Construct Solid
Bottom Min.
3/8Plywood
Supported by
2 x 4 or 2 x 2
Runners all
Four Sides
30
23-1/2
25-1/4
17-1/2
2Min.
(3
Recommended)
Per Oven
Requirement
2Min.
(3
Recommended)
PREPARE THE OPENING (cont.)
Installation over a GE/Monogram oven:
• If you are replacing a GE/Monogram electric
double oven with the combined installation
of an Advantium 120V and a single oven, use
the dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2 minimum shown.
30
23-1/2
25-1/4
17-1/2
2Min.
(3
Recommended)
Construct Solid
Bottom Min.
3/8 Plywood
Supported by
2 x 4 or 2 x 2
Runners all
Four Sides
Per Oven
Requirement
Per Warming
Drawer Requirement