— 3 —
Installation, Operation and Care of
MODEL VEC SERIES ELECTRIC
CONVEYOR OVENS
PLEASE KEEP THIS MANUAL FOR FUTURE USE
GENERAL
Vulcan-Hart ovens are produced with quality workmanship and material. Proper installation, usage,
and maintenance of your oven will result in many years of satisfactory performance.
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions
provided.
INSTALLATION
Before installing, verify that the electrical service agrees with the specifications on the rating plate
located on the right front side panel. If the supply and equipment requirements do not agree, do not
proceed with the installation. Contact your Vulcan-Hart service representative immediately.
UNPACKING
This oven was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check
for possible shipping damage. If the oven is found to be damaged, save the packaging material and
contact the carrier within 15 days of delivery.
1. Tilt the oven on its back side.
2. Place the oven on a four-wheel dolly.
3. Move oven to its installation position.
4. Remove oven from the dolly and place on two pieces of 2 x 4 wood.
5. Carefully unpack oven.
Do not use the door or handle to lift oven.
LOCATION
When the crate is turned on its side, the oven will pass through a 34" (86 cm) door opening (or 30"
[76 cm] opening without the crate). Verify that the doors and access routes into the kitchen area will
permit clearance.