Vulcan-Hart GH6C Range User Manual


 
– 17 –
Convection Oven Pilot
Before lighting oven, be sure that range top sections have been lit.
1. Connect range to the main electrical supply line. Open oven door panel and locate square pilot
lighter cutout.
2. Turn red gas valve (located behind the control panel) ON, purging the gas line of all air. Turn gas
valve and power switch OFF. Close oven door.
3. Light oven pilot by depressing the red ignition button (Fig. 20), and using a taper, ignite the pilot.
Hold ignition button in for 30 seconds, or until pilot remains lit. Turn gas valve back ON.
4. If pilot fails to light, turn main gas valve OFF. Wait 5 minutes and repeat Steps 2 and 3.
5. After pilot is lit, push the power switch ON and turn the temperature dial to the desired setting.
Nightly Shutdown: Turn power switch OFF and the temperature dial to 0 degrees.
Complete Shutdown:
1. Push power switch OFF.
2. Turn red gas valve (located behind the control panel) OFF.
3. Turn main gas supply OFF.
4. Disconnect electrical supply cord.
ADJUSTMENTS
All adjustment procedures associated with pilot lighting should be performed by an authorized Vulcan-
Hart installation or service person. The bypass (minimum burner) flame adjustment must be made
at the time the range is installed.
After adjustments are complete, replace oven control panel(s). Check identification so that each panel
is returned to its respective range. Replace oven baffles and oven bottom(s).
Replace upper manifold panel(s). Position brick in ranges where necessary (Fig. 21). Replace top
casting(s). Check identification so that each may be returned to its respective original range as
received from the factory.
Fig. 21