Americana Appliances ABS300 Range User Manual


 
38
Installation Instructions
INSTALL THE RANGE
(CONT.)
FINAL INSTALLATION
CHECKLIST
Check to make sure the circuit breaker is
closed (RESET) or the circuit fuses are
replaced.
Be sure power is in service to the building.
Note (on some models): If the clock flashes
“bAd” and then “LinE” with a loud tone,
the neutral connection to the range is
miswired. Check the terminal block
connections and/or house wiring to correct.
Check to be sure that all packing materials
and tape have been removed. This will
include tape on metal panel under control
knobs (if applicable), adhesive tape, wire
ties, cardboard and protective plastic.
Failure to remove these materials could
result in damage to the appliance once the
appliance has been turned on and surfaces
have heated.
Check to make sure that the rear leveling
leg is fully inserted into the Anti-Tip bracket
and that the bracket is securely installed.
11
OPERATION CHECKLIST
Turn on one of the surface units to observe
that the element glows within 60 seconds.
Turn the unit off when glow is detected. If
the glow is not detected within the time
limit, recheck the range wiring connections.
If change is required, retest again. If no
change is required, have building wiring
checked for proper connections and voltage.
Check to make sure the Clock (on models
so equipped) display is energized. If a series
of horizontal red lines appear in the display,
disconnect power immediately. Recheck the
range wiring connections. If change is
made to connections, retest again. If no
change is required, have building wiring
checked for proper connections and
voltage. It is recommended that the clock
be changed if the red lines appear.
Be sure all range controls are in the OFF
position before leaving the range.
12