Bertazzoni X304PIRNE Convection Oven User Manual


 
15
4) Loose strain relief by unscrewing the two
strain relief's screws as in diagram.
5) Remove damaged supply cord set by taking
off the 4 electrical connection screws (block
L1, N, L2 and Ground screw, see diagram)
6) Insert the new supply cord set in the strain
relief and lock it with two strain relief's
screws in suitable position.
7) Fix well the ring terminals G, L1, N, L2 of the
new supply cord set as shown in diagram
with its 4 screws
8) Reinstall the back enclosure panel with 6
screws
9) Slide the appliance back into its proper
location
10) Reconnect the appliance to the electrical
power.
ELECTRICAL GROUNDING
This appliance is equipped with a fourprong plug
for your protection against shock hazard and
should be plugged directly into a properly
grounded receptacle. Do not cut or remove the
grounding prong from this plug.