Best ISER222 Ventilation Hood User Manual


 
- 7 -
WIRING
Note: This range hood must be properly
grounded. The unit should be installed by a
qualified electrician in accordance with all
applicable national and local electrical
codes.
1. Remove the wiring box cover. Remove a
knockout from the wiring box.
2. Feed 6" of power cable through the knock-
out opening and secure cable to the wiring
box with an appropriate connector.
3. Make electrical connections. Connect white
to white, black to black and green to green.
4. Replace wiring box cover and screws. Make
sure that wires are not pinched between
cover and box.
WIRING BOX
COVER
CONNECT DUCTWORK
1. Use 8" round metal duct to connect the
discharge collar on the hood to the ductwork
above.
2. Use duct tape to make all joints secure and
air tight.
3. Remove the two temporary retaining
screws from the lower flue and set it in place
on the hood.
4. Secure decorative flue to hood with two
mounting screws (3.9x9.5mm).
LOWER FLUE
8” ROUND METAL
DUCT
RETAINING
SCREWS
MOUNTING SCREWS
(3.9X9.5MM)