Blodgett KLT-G Series Hot Beverage Maker User Manual


 
6
INSTALLATION (Continued)
All units must be installed in such a manner that the flow of combustion and ventilation air are
not obstructed. Provisions for an adequate air supply must also be provided. Do not obstruct
side of the unit, as combustion air enters through this area.
Information on the construction and installation of ventilating hoods may be obtained from the
standard for “Vapor Removal from Cooking Equipment”, NFPA No. 96 (latest edition), available
from the National Fire Protection Association, Batterymarch Park, Quincy, MA, USA, 02269.
TO INSTALL
1. Uncrate carefully. Report any hidden freight damage to the freight company immediately.
2. The pressure relief valve is located at the right rear of the unit. This area should be kept
clear and should not be in an area where operators will normally stand. The elbow on the
relief valve should be turned toward the floor. A maximum 3 foot, 3/4" diameter pipe may be
used to extend to the floor, but must not be piped directly to a drain. It must vent to the
atmosphere.
3. Set the unit in place. Be certain to maintain minimum clearances as stated above.
4. To level the unit use a spirit level in all directions on the top of the kettle (lid up). Adjust the
bottom foot on each leg to overcome an uneven floor.
5. Mark hole locations on floor through anchoring holes provided in flanged adjustable feet.
6. Remove appliance and drill holes in locations marked on floor and insert proper anchoring
devices.
7. Set unit back in position and re-level left to right and front to back.
8. Bolt and anchor appliances securely to the floor.
9. Seal bolts and flanged feet with silastic or equivalent compound.
10. Appliance location must allow air supply to unit and obstruction free clearance for air
opening into the combustion chamber.
11. Make service connections as indicated.
12. Check the pressure gauge on the front panel before operating. If the pressure gauge does
not indicate green vacuum zone (below 0 psi), see “Re-establishing Vacuum” section under
SERVICE, after completing installation instructions.