Bloomfield 2274EX Coffeemaker User Manual


 
INSTALLATION INSTRUCTIONS
READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION
REFER TO EXPLODED VIEWS PAGES 16 thru 19 FOR
COMPONENT NAMES/NUMBERS
1. Unpack the unit. Inspect all components for completeness
and condition. Ensure that all packing materials have been
removed from the unit.
2. (See page 13.) Remove the Top Warmer Unit (#106) or Top
Cover (#102) and inspect the internal components. Verify
that all wiring and hoses are connected and are properly
seated. Verify that the Tank Cover Assembly (#9) and Tank
Cover Gasket (#6) are securely installed. Reinstall top.
3. (See page 13.) Verify that the Spray Head (#24) and Spray
Head Gasket (#23) are properly installed.
LEVELING THE UNIT
1. Verify that an adjustable leg is installed at each corner of the
brewer.
2. Set Brewer in its operating location.
3. Level the Brewer. A spirit level should be placed on the top
of the unit, at the edge, as a guide when making level
adjustments.
4. Level the unit from left to right and front to back by turning the
adjustable feet. Be sure all four feet touch the counter to
prevent tipping.
PLUMBER’S INSTALLATION INSTRUCTIONS
1. Brewer should be connected to a POTABLE WATER, COLD
WATER line. Flush water line before connecting to Brewer.
2. DO NOT use a saddle valve with a self-piercing tap for the
water line connection. Such a tap can become restricted by
waterline debris. For systems that must use a saddle tap,
shut off the main water supply and drill a 3/16” (minimum) tap
for the saddle connection, in order to insure an ample water
supply. Remember to flush the line prior to installing the
saddle.
3. The brewer must be installed on a water line with average
pressure between 20 PSI and 90 PSI. If your water pressure
exceeds 90 PSI at anytime, a pressure regulator must be
installed in the water supply line to limit the pressure to not
more than 90 PSI in order to avoid damage to filters, lines
and solenoid.
IMPORTANT:
To enable the installer to make
a quality installation and to
minimize installation time, the
following suggestions and tests
should be done before the
actual unit installation is started:
CAUTION: Equipment
Electrical Damage
DO NOT plug in or energize this
appliance until all Installation
Instructions are read and
followed. Damage to the
Brewer will occur if these
instructions are not followed.
CAUTION: Unstable
Equipment Hazard
It is very important for safety
and for proper operation that the
brewer is level and stable when
standing in its final operating
position. Provided adjustable,
non-skid legs must be installed
at each corner of the unit.
Failure to do so will result in
movement of the brewer which
can cause personal Injury and/
or damage to brewer.
NOTE: Water supply inlet line
must meet certain minimum
criteria to insure successful
operation of the brewer.
Bloomfield recommends 1/4"
copper tubing for installation of
less than 12 feet and 3/8" for
more than 12 feet from a 1/2"
water supply line.
4