2.5 Vent piping
1. Install 5" to 4" reducer pipe on top of the water
heater and then connect a 4" 90º elbow to begin
the horizontal run. Use 4" vent pipe to connect
from this elbow to the power vent motor inlet,
avoiding elbows wherever possible. The maximum
vent length from the water heater to the point of
termination is 25 feet. (Fig. 5) If using more than
one 90° elbow, subtract 5 feet off the maximum
vent length for each additional elbow used. A
maximum of three elbows is allowed. The
minimum vent length is 2 ft.
2. Support the vent pipe in accordance with vent pipe
manufacturer’s instructions. Vent pipe is not
supplied in the power vent kit, with the exception
of the 5" to 4" reducer in the AQ4 kit. Observe the
clearances associated with the class of vent pipe
used. 4” single wall galvanized, 4” stainless steel
or 4” B-vent pipe is required.
2.6 Linear safety spillage switch
The linear safety spillage switch provides a means
for safety shut down of the water heater in the event
of flue blockage or power vent failure. If hot flue
gases spill from the draft hood diverter, the draft
spillage sensing switch will open the pilot safety
circuit and shut off all gas to the water heater. The
switch is normally closed and opens at temperatures
greater than 185º F. It has a manual reset button.
Mounting the linear safety spillage switch
1. Attach the spillage switch to the top left of the
heater’s draft diverter using the existing hole and
the included mounting screw. (Fig. 6)
2. Lay copper capillary sensing tube across top of
the draft diverter. Allow excess tube to hang down
right side of heater.
Do noDo no
Do noDo no
Do no
t cut or crt cut or cr
t cut or crt cut or cr
t cut or cr
imim
imim
im
pp
pp
p
capillarcapillar
capillarcapillar
capillar
y tube.y tube.
y tube.y tube.
y tube.
3. Route the two wires from the spillage switch down
the left side of heater to the ECO keeping the cables
out of contact with hot surfaces. (Fig. 6)
Connecting linear safety spillage switch to pilot
safety circuit
The ECO/temperature limiter is mounted on the
lower left outlet water pipe. (Fig. 7)
1. Remove one wire lead connected to ECO terminal
(it does not matter which one is disconnected).
2. Attach 1/4" quick connect terminal end of linear
spill switch cable to now exposed terminal of the
ECO.
3. Connect the male spade connector to the removed
lead wire from step 1. See the wiring diagram in
Fig. 13 to confirm proper set up.
Fig. 5 Venting setup
AQ4 Installation instructions
Fig. 6 Linear safety spillage switch mounting
Fig. 7 ECO location
ECO terminals