Broan 355CSOBR Ventilation Hood User Manual


 
MODELS 355CSOBK • 355CSOBR
Page 2
4. Working from the inside of your attic, find the desired
ventilator location and mark a spot halfway between
rafters at a point that is 24” – 36” below the roof ridge.
5. Drill a guide hole through the roof at this mark.
6
1
2
3
4
5
7
8
9
INSTALLATION
Note: This ventilator is capable of replacing an existing
120 volt powered attic ventilator. Only a qualified per-
son should remove any electrical wiring in accordance
with local codes and standards.
1. Determine the sun’s best exposure location on your roof
barring shade (trees, other buildings etc.) at 4:00pm in
the hottest month of the year. Generally, we recommend
a point located 24” – 36” on center below the roof peak
and centrally along the ridgeline on the south, southwest,
or west side of the home.
2. Prior to installation, we recommend setting up the
ventilator to verify operation. Take the ventilator to a
location exposed to sun. Removing the cardboard
cover from the solar panel should cause the ventilator
to operate. Secure cardboard in place over solar panel
(for safety).
3. Separate the ventilator dome from the ventilator base by
removing the four (4) stainless steel 5/16” sheet metal
screws. Lift the ventilator dome off the ventilator base
and proceed to the following steps.
The illustrations in this section reflect an installation involving
composite shingle roofing material. This product is also
suitable for installations on tile, slate, metal or membrane
roofs.