Page 3
ALLURE
®
QS2 SERIES
RANGE HOOD
PREPARE THE HOOD PREPARE THE HOOD
4 Remove
Damper/Duct
Connector
from inside
the hood. Set
connector
aside - with
mounting
screws and
parts bag.
3 Remove
Teflon
®
-coated
bottom cover
from hood.
Set cover and
mounting screws
aside.
5 Remove either
top or back
wiring knock-
out and install
approved
Electrical
Cable Clamp.
DAMPER/
DUCT
CONNECTOR
ELECTRICAL CABLE CLAMP
TEFLON
®
-COATED BOTTOM COVER
(Held in place with 2 screws)
Teflon
®
is a registered
trademark of DuPont.
Non-Ducted Installation - Skip to Step 15.
The following
6 Remove Light Panel - held in place with (3) #8 screws
and (2) #8 screws. Disconnect light assembly wire harness
(white connector).
(3) #8 SCREWS
LIGHT
PANEL
(2) #8 SCREWS
Steps (6 thru
14) are for
DUCTED
INSTALLATION
ONLY.
BAFFLE
7 Remove Air
Chute - held in
place with one
(1) screw.
NOTE: Be care-
ful not to discon-
nect any wires.
9 Rotate baffle. Re-
insert baffle into air
chute (as shown) so
that baffle tabs fit all
the way into slots in
air chute. An audible
“click” will be heard
when fully installed.
This will close off
the air flow through
the non-ducted slots
on top of hood.
10
Re-install air chute, re-connect wire
harness, and replace light panel.
NOTE: Be careful not to trap wires
between support fin and light panel.
AIR CHUTE
SLOTS
8 Remove Baffle
from air chute.
BAFFLE
SUPPORT FIN
TABS