Bunn CWTF APS-DV Coffeemaker User Manual


 
Page 5
36102 090203
ELECTRICAL REQUIREMENTS
CAUTION - The brewer must be disconnected from the power source until specified in
Initial Set-Up.
Requires 2-wire,
grounded service
rated 120 volts ac,
15 amp, single
phase, 60 Hz.
120V VERSION 120/208-240V VERSION
Requires 3-wire,
grounded service
rated 120/240 volts
ac, 20 amp, single
phase, 60 Hz.
ELECTRICAL HOOK-UP
CAUTION Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service.
2. Determine the available on-site electrical service.
3. Select the desired unit voltage based on the available on-site electrical service.
4. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
5. Remove the front access panel beneath the sprayhead to gain access to the terminal block.
6. Feed the supply leads through the rear of the brewer.
7. Using the above diagrams, connect the desired electrical service to the field wiring terminal block.
8. Before proceeding, verify the voltage at the field wiring terminal block.
9. Set toggle switch on component bracket to the appropriate position and replace the access panel.
10. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for
Initial Set-Up
.
Models CWTF-DV & CWTF-APS DV
Requirements for brewers without an attached cord set are as follows: