Bunn FPG-2 DBC Coffeemaker User Manual


 
3
USER NOTICES
Carefully read and follow all notices on the grinder and in this manual. They were written for your protection.
All notices on the grinder are to be kept in good condition. Replace any unreadable or damaged labels.
Replacement part
#20545.0000
Replacement part
#05876.0000
36705 031504
ELECTRICAL REQUIREMENTS
This grinder has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15 amp,
single phase, 60 Hz.
OPERATING CONTROLS
Grind Pad (a)
Pressing initiates a timed grind cycle.
Stop Pad (b)
Pressing ends the operation of the grinder.
® PAD (c)
Pressing the ® pad allows programming access
(see page 5).
Hopper/Batch Selector Pads (d)
These pads are located on the funnel depictions on each side of the grinder with a total of 6 pads. Selecting
one of these pads will select the amount of grind and side from which to grind.
Example: Selecting the lower pad on the left side will grind enough beans from the left side of the grinder to
brew the amount programmed into grinder.
Control Board
The control board determines the amount of beans that will leave the hopper in a grind cycle. The timer
portion can be adjusted to dispense a different amount from each hopper and each batch size. The scale is from
0.4 to 99.9 seconds. Refer to the Adjustments section for timer setting chart (page 5).
GRINDER DBC
®
d
d
c
b
a