Cannon CARRICK Electric Pressure Cooker User Manual


 
34
INSTALLATION INSTRUCTIONS
INSTALLATION AND OPERATIONAL CHECKS
After installation, check for gas soundness. The supply pressure can be checked at the front left hotplate
burner injector.
Fit the hotplate burner bodies and caps, pan supports and
shelf shield(s). Referring to the instructions for use
where necessary,
1. Check that the hotplate burners ignite and cross-light to all ports. Check for a steady flame on the low setting.
2. Check that the grill burner ignites and cross-lights to all ports and that the flames remain when the control is
released 3 seconds later, Check
for a steady flame on the low setting.
3. Check that with the main oven set to mark 9, the burner ignites and that tha flames remain when the control is
released 3 seconds later. Leave the oven full on with the door closed for 10 minutes, and check
that when the
control is turned to mark 1 that the flame reduces.
4. Check that with the top oven set to mark 8, the burner ignites and that the flames remain when the control is
released 3 seconds later. Leave the oven full on with the door closed for 10 minutes, and check that when the
control is turned to mark 1 that the flame reduces.
5. Check the operation of the timer and oven light.
Instruct the user on operation of the cooker.
On those models adjusted for use with LPG, it is normal for the oven and grill burners to burn with yellow tips.