Cecilware GB8M-10-LD-U Hot Beverage Maker User Manual


 
START-UP PROCEDURE
Caution: Make sure that the Heater Switches, are in the OFF position.
1. Connect the ¼ inch copper waterlines to the ¼ inch flare water inlet fittings of the valves.
2. Plug the power cords into dedicated receptacles.
3. Activate the Power Switch (Toggle Up). The door display panel, the red power indicator lights
and the green dispense buttons will light up and the tanks will start filling. Allow approximately
4-5 minutes for the tanks to fill.
4. Activate the Heater Switch. Allow approximately 10-30 minutes for the water to reach the
proper dispensing temperature of 190° F. The heat up time will depend on the water inlet
temperature, the input voltage and the wattage of the elements in the water tanks.
5. Place a cup under the dispense nozzle, press and hold the dispense switch for 6 seconds. The unit
will dispense water at the rate of 1 oz. per second. Repeat it several times to check for consistent
output. Repeat same for the other dispense switches. This procedure checks that the dispense
valves are not “air-locked.”
6. While the water tanks are heating up, the heater light comes on. Remove the hoppers, load them
with product and reposition them back in place. When the heater light turns off, the water tanks
have reached their proper temperature and are ready to dispense the first cup of Cappuccino.
TO DIPENSE A CUP OF CAPPUCCINO:
Place a cup under the selected drink dispense nozzle.
Push and hold dispense button until cup is 2/3 full, then release button.