Right - 6”, Left - 6”, Rear - 6” (12”
on control side if adjoining wall or
equipment is over 30” high for
service access)
For use in non-
combustible locations.
Contact factory for
variances to clearances
Do not use PVC pipe for drain.
E
ach compartment has capacity for:
E
ight, 12˝ x 20˝ x 2
1
2˝
deep Cafeteria Pans. Can
a
ccomodate 18˝ x 26˝ Bun Pans.
WATER QUALITY REQUIREMENT
The recommended minimum water quality standards
whether untreated or pre-treated, based upon 10 hours of
u
se per day, and a Daily Blowdown, are as follows:
TOTAL DISSOLVED SOLIDS less than 60 parts per million
TOTAL ALKALINITY less than 20 parts per million
S
ILICA less than 13 parts per million
p
H FACTOR greater than 7.5
CHLORINE less than 30 parts per million
C
onsult a local water treatment specialist for an on site
water analysis for recommendations concerning steam
generator feed water treatment (if required), in order to
r
emove or reduce harmful concentrations of minerals. The
u
se of highly mineralized water will mean that more
f
requent servicing of the steam generator will be
necessary. The fact that a water supply is potable is not
proof that it will be suitable for the generator.
NOTES:
**DO NOT CONNECT TO GFI OUTLET. CLEVELAND RANGE RECOMMENDS GAS FIRED 120 VOLT STEAMERS BE HARD WIRED DIRECTLY TO ELECTRICAL SYSTEM.
Cleveland Range reserves right of design improvement or modification, as warranted.
Many regional, state and local codes exist and it is the responsibility of the owner and installer to comply with the codes.
Cleveland Range equipment is built to comply with applicable standards for manufacturers. Included among those approval agencies are ASME/N. Bd, UL/NSF#4 and CSA (AGA, CGA).
** Do not connect to GFI