7. Rinse out food debris from the kettle and flush through the metering filling
station (MFS or food pump) if they are still connected. If the kettle is not
connected to the food pump, open the valve and allow rinse water to flush into
the floor drain.
8. Remove agitator arm:
a. Rotate the agitator until the pull pin is visible.
b. Turn power to OFF as a safety precaution.
c. Pull quick release pin out.
d. Slide coupling upward.
e. Carefully lift agitator, pull back and lift out.
f. Remove scraper blades from agitator by using the spring removal tool
provided with the kettle.
g. Wash agitator arm, scraper blades, and springs with mild dish detergent or
in dish machine. Air dry.
9. Wash the inside of the kettle with a mild dish detergent as you would any pot
or pan. Flush liquid through MFS or by opening the valve. Rinse thoroughly.
Allow to air dry.
10. Open kettle valve. Remove the valve and tee from the bottom of the kettle by
removing the clamp. Remove o-rings. Wash and dry thoroughly. When re-
installing the valve, apply USDA approved food grade grease (Chesterton 622
or equal) to o-rings. Gently push tee and valve body in place and secure with
clamps.
11. Remove temperature sensor probe by removing clamp. Slide sensor out of seal
holder. Remove o-rings. Clean sensor, seal and o-rings. Before re-installing,
apply a liberal amount of USDA approved food grade grease on o-rings.
REASSEMBLY
1. Install scraper blades with springs on agitator arm.
2. Lift agitator arm into kettle, set in place by the drive shaft and slide the slip
collar or coupling into place and put quick release pin into both.
3. Turn Control Power on. Grease o-rings for the valve and install o-rings.
4. To assemble the valve actuator and stem: a. reconnect the air line, b. place
stem in valve actuator, c. apply pressure to the tope of the stem, d. while
applying pressure to the stem have someone turn the valve switch to the open
position. The stem should lower into the actuator.
5. Attach tee pipe to bottom of kettle with clamp.
6. Attach valve actuator to the tee with clamp.
7. Turn product valve switch to the closed position and kettle valve will close.
8. Grease o-rings for the temperature probe and install o-rings on synthetic seal
holder.
9. Slide temperature probe into seal holder.
10. Slide both into opening in kettle and attach with clamp.