Cleveland Range OES-12.20 Electric Steamer User Manual


 
NOTES:
Cleveland Range reserves right of design improvement or modification, as warranted.
Many regional, state and local codes exist and it is the responsibility of the owner and installer to comply with the codes.
Cleveland Range equipment is built to comply with applicable standards for manufacturers.
SECT
.
IIA P
AGE
40
0707
W1
W2
D
RC
S
CS
AV
G
E1
E2
W1
W2
D
RC
S
CS
AV
G
E1
E2
W1
W2
D
RC
S
CS
AV
G
E1
E2
The "Advanced Closed System" offers the following advantages:
Saves energy
Automatic moisture level adjustment
Low heat and steam emission to the kitchen
Automatically regulated steam injection
Enables immediate change into the steam mode
"Crisp & Tasty" demoisturizing function
Model: OES-12.20
Pan Capacity [
Unit (trolley) has 12 slide rails at 2.64" (67mm) apart
]:
1
2
(
20" x 26") full size wire racks
1
2
(
18" x 26") full size sheet pans -
o
n wire racks
2
4
(
13" x 18") half size sheet pans -
o
n wire racks 24
(
12" x 20" x 2 1/2") steam table pans
2
4
(
12" x 20" x 1") steam table pans
2
4
(
12" x 20") frying baskets - (
n
o wire racks needed
)
For Banquet Operations: Optional Plate Rack holds 74 plates
Unit Dimensions:
Width - 53.83", Depth - 44.34", Height - 57.73"
Shipping Dimensions: Width - 60", Depth - 50", Height - 66"
(including packaging)
Shipping Weight: 717 Lbs (including trolley)
Required Clearances:
Rear - 2", Left Side - 4", Right Side - 2 1/2"
Allow for sufficient distance if a "high heat source" (i.e. Broiler) is located
next to the unit.
Allow for sufficient clearance on left side for service access (contact the
factory service department for recommendations).
Installation must comply with all local fire and health codes.
Agency Approvals: UL, UL - Sanitation (NSF Standards)
Electrical Requirements: 208/3/60 240/3/60 440/3/60 480/3/60
Total Connected Load: 26.3 KW 34.9 KW 29.4 KW 34.9 KW
Hot Air: 25.8 KW 34.3 KW 28.8 KW 34.3 KW
Amps per Phase: 77.8 88.8 41.4 44.9
Do not connect to a G.F.I. outlet
Water Connections: Cold Water (drinking water quality)
Flow Pressure:
30 - 60 PSI
Water Inlets: 3/4" GHT-F (Female Garden Hose Connection)
T
reated Water for Steam Production
Untreated Water for Condenser and Hand Shower
Drain Connection: 2" Tube
Venting: Exhaust Hood
required
Air Vent
*Connection for Cleaning Solution
*Connection for Rinse Cycle
Low Pressure Safety Valve
*A
vailable as an option
W1
W2
D
RC
S
CS
AV
G
E1
E2
W1
W2
D
RC
S
CS
AV
G
E1
E2
W1
W2
D
RC
S
CS
AV
G
E1
E2
W1
W2
D
RC
S
CS
AV
G
E1
E2
W1
W2
D
RC
S
CS
AV
G
E1
E2
48.51"
2.52"
1.58"
46.70"
9.06"
2
.80"
56.15"
41.54"
2.80"
12.68"
2
.80"
8
.55"
2.60"
3.39"
4.81"
7.48"
13.08"
3.08"
14.26"
10.87"
42.29"
3.15"
6.50"
10.40"
25.79"
18.90"
2.96"
27.29"
1.19"
29.57"
5.48"
3.00"
4.97"
S
AV
E
1
E
2
RC
CS
W
1
W
2
D
G
FRONT VIEW
TOP VIEW
BOTTOM VIEW
31.50"
4
8.51"
2
.52"
1
.58"
46.70"
9
.06"
2.80"
56.15"
41.54"
2.80"
1
2.68"
2.80"
8.55"
3.39"
4.81"
7.48"
13.08"
3
.08"
14.26"
10.87"
42.29"
3.15"
6
.50"
10.40"
25.79"
18.90"
2.96"
27.29"
1.19"
29.57"
5
.48"
3
.00"
4.97"
S
A
V
E1
RC
CS
W
1
W
2
D
G
FRONT VIEW
TOP VIEW
B
OTTOM VIEW
31.50"
48.51"
2.52"
1
.58"
46.70"
9.06"
2.80"
56.15"
41.54"
2.80"
12.68"
2.80"
3.39"
13.08"
3.08"
14.26"
10.87"
42.29"
3.15"
6.50"
25.79"
18.90"
2.96"
27.29"
1.19"
29.57"
5.48"
3.00"
4.97"
S
AV
RC
CS
W1
W2
D
FRONT VIEW
TOP VIEW
BOTTOM VIEW
31.50"
A = Water hook up soft water G"
B = Water hook up cold water G"
C = drainage hook up DN50
D = power hook up
E = Potential equaliser
F = Final rinse hook up
G = Cleaner hook up
H = Air vent pipe
I = Low pressure safety
OEB 12.20
A = Water hook up soft water G"
B = Water hook up cold water G"
C = drainage hook up DN50
D = power hook up
E = Potential equaliser
F = Final rinse hook up
G = Cleaner hook up
H = Air vent pipe
I = Low pressure safety
OES 12.20
OGB 12.20
AWater hook up soft water G"
BWater hook up cold water G"
CDrainage hook up DN50
DPower hook up
EPotential equaliser
FFinal rinse hook up
GCleaner hook up
HAir vent piper
I Low pressure safety
J Gas hook up R"
KExhaust pipe gas (Hot air heating)
LExhaust pipe gas (Steam generator)
OGS 12.20
A = Water hook up soft water G"
B
= Water hook up cold water G"
C = Drainage hook up DN50
D = Power hook up
E = Potential equaliser
F = Final rinse hook up
G = Cleaner hook up
H = Air vent pipe
I
= Low pressure safety
J = Gas hook up R"
K
= Exhaust pipe gas