OPERATION METHOD
Connect it to voltage rating that matches it on the rating plate.
Open the valve to supply water to the water purifier.
Connection to the Power
Open the Supplying Water Valve
CAUTION !!
After installed, moved, and severely shaken, about 30 minutes are needed for
stabilization of cooling device before using the product.
Note: The cold and hot water you drink are made of the purified water. Therefore,
you do not need to care the quality of them.
After installation the power supply cord and plug shall be accessible.
WARNING