Electrolux EFC 9418 Ventilation Hood User Manual


 
S
9S
2
1
6
6
4
7
5
8
12
13
13
14
15
15
4
4
11
9S
9S
9K
9K
9K
9K
4
Ø 120mm
10S
14
7
K
9K
9K
6
6
7
7
3
3
Installation
Wall unit mounting - Fig. 6
Put the template onto the wall (1) and drill two Ø12mm holes (2).
Fit two hooks (3) on the drilled holes.
Remove the metal filters (4) and hang the hood on the hooks and adjust the position of the hood using the two
screws on the bottom of the hooks (5).
Depending on the model, mark 2 or 4 points (6). Remove the hood and drill 2 or 4 Ø8mm holes on the marked
points. Fit 2 or 4 Ø8mm wall dowels, Hang again the hood and fix the hood definitively with 2 or 4 screws
5X45 (7).
Fix the chimney support (8) with two screws 5 x 45 mm and two wall dowels on the wall close to the ceiling.
For the extraction version: Fit the connection ring (S) on the top of the hood with two screws Ø 3,5 x 6,5
mm (9S) then fit an axhausting pipe long enough to reach the outside (10S).
For the recirculation version: Fix definitively the deflector (K) on the top of the hood with two screws Ø
3,5 x 6,5 mm (9K).
Prepare the electric connection (11)
(see relative chapter).
Fit the chimney (12) and fix it on
the chimney support with two
screws 3,0 x 9 mm (13).
The lower part of the chimney
must be slided down and inserted
on the housing on the upper part of
the hood (14).
Fit the two grids (15) on both
sides of the chimney.
Fig. 6