x 4
1
2
3
4
5
1
2
Tie together to avoid kinking.
Ensure product is level and aligning with cabinetry. Using the
most appropriate length Hexagonal socket supplied, fully extend
levelling feet up to required distance by hand.
Hexagonal socket
AA
B
ROUTE THE HOSES AND MOVE INTO THE CAVITY
6
REMOVE THE DRAWER AND LEVEL THE PRODUCT
7
2
1
1
3
3
optional
optional
(x2)
Ensure hoses and cord
are not kinked or twisted.
B
30 mm
1
2
3
4
5
5
5 ”
(
150 mm)
Ensure the drawer is removed and
then rotated anti-clockwise
to prevent kinked hoses.
150 mm
A
OR
Loosen feet only and
take care when pushing
the product into the
cavity that you do not
bend the feet.
If top mounting brackets are being
used, ensure they’re securely fitted
before sliding product into cavity.
(1,1) -2- 599684B DD60D installA2 NZGB.indd 6/7/09 11:49:38 AM
(1,1) -2- 599684B DD60D installA2 NZGB.indd 6/7/09 11:49:38 AM