Franke Consumer Products FTU 3807 I Range User Manual


 
EN
1
0
10
PREPARATION OF THE FRAME FOR THE HOOD IN RE-
CYCLING VERSION
In case the hood is used in recycling version it is neces-
sary to prepare the frame with all the necessary connec-
tion pieces. In order to make the installation easier it is
necessary to lengthen the frame:
• Unscrew the two screws 2.1 fixing the upper chim-
ney to the frame and pull the chimney out.
• Unscrew the four safety screws placed at the top in
the frame separation area. (A).
• Unscrew the eight metric screws connecting the two
columns, placed on both sides of the frame (B).
Installation of components in recycling version:
• Fix the recycling air outlet piece 15 to the upper part
of the frame using four 12c screws supplied with the
hood.
• Fix the flange (ø 4” 3/4) 10 to the lower part of the
recycling air outlet 15.
Put the reducer flange 9 on the hood body outlet.
• At this point, join the flanges with a pipe. In order to
calculate the height of the pipe it is necessary to es-
timate the height of the hood and subtract 24” 3/16.
(H pipe = H hood-24” 3/16).
• Lengthen the frame so that the pipe can be inserted.
Place the pipe between the two flanges and block it.
Make sure that the height of the frame is correct con-
sidering the height of the cooker hood (H frame = H
hood – 7” 1/4). Adjust the height of the frame and
tighten again the earlier removed screws. Tighten
again the safety screws in order to give more stability
to the structure.
• Fix the pipe with the pipe clamps 25 supplied with
the hood.
Note: The Hood body should be secured to ceiling
joists. If necessary, install a wood support behind the
dry wall, flush mounted between 2 joists. This will pro-
vide the necessary structure and support for mounting.
A
B
15
12c
10