Frigidaire RH30WC55GS Ventilation Hood User Manual


 
77
77
7
Installing the hood
Installing the hood
For the most efficient air flow exhaust, use a
straight run or as few elbows as possible.
Vent unit to outside of building, only.
On avarage 2 to 3 hours are necessary to com-
plete installation (without considering cut to be
done on wall and or on cabinet, installation of
ducts , conduit and electrical connections to the
mains).
The hood is fitted with Screws and Drywall
Anchors suitable for most surfaces, consult a
Qualified Installer, check if they perfectly fit with
your cabinet/wall.
Do not use flex ducting.
COLD WEATHER installations should have an
additional backdraft damper installed to minimize
backward cold air flow and a nonmetallic thermal
break to minimize conduction of outside
temperatures as part of the ductwork. The
damper should be on the cold air side of the
thermal break.
The break should be as close as possible to
where the ducting enters the heated portion of
the house.
Make up air: Local building codes may require the
use of Make-Up Air Systems when using Ducted
Ventilation Systems greater than specified CFM of
air movement.
The specified CFM varies from locale to locale.
Consult your HVAC professional for specific
requirements in your area.
TT
TT
T
ypical installationypical installation
ypical installationypical installation
ypical installation
Min installation height from the range top to the
bottom of the hood is 30" if a gas range is used
or 24" to 30" if an electric range is used.
These hoods arThese hoods ar
These hoods arThese hoods ar
These hoods ar
e not re not r
e not re not r
e not r
ecommended to be usedecommended to be used
ecommended to be usedecommended to be used
ecommended to be used
over indoor grills.over indoor grills.
over indoor grills.over indoor grills.
over indoor grills.
The hood may be installed onto a wall and vented to
the outdoors, or it can be installed for recirculating
operation (recirculating accessories not supplied with
the hood).
This hood can be installed over any electric and gas
cooktop/range.
It can not be installed over any prIt can not be installed over any pr
It can not be installed over any prIt can not be installed over any pr
It can not be installed over any pr
ofessionalofessional
ofessionalofessional
ofessional
cooktop / range.cooktop / range.
cooktop / range.cooktop / range.
cooktop / range.
Installing prInstalling pr
Installing prInstalling pr
Installing pr
eparationeparation
eparationeparation
eparation
Advance planningAdvance planning
Advance planningAdvance planning
Advance planning
Determine the exact location of the vent hood.
Plan the route for venting exhaust to the
outdoors.
Use the shortest and straightest duct route
possible.
Refer to “
Ductwork installation guidelinesDuctwork installation guidelines
Ductwork installation guidelinesDuctwork installation guidelines
Ductwork installation guidelines”
paragraph for further informations.
Install a wall cap with damper or roof cap at the
exterior opening. Order the wall or roof cap and
anytransition needed in advance.
Use 8" round metal ductwork only.
WW
WW
W
all framing for adequate supportall framing for adequate support
all framing for adequate supportall framing for adequate support
all framing for adequate support
This vent hood is heavy.
‘Adequate structure and support must be
provided in all types of installations. Thehood
must be secure to vertical studs in the wall, or to
a horizontal support.
The vent hood should be on site before final
framing and wall finishing. This will help to
accurately locatethe duct work and electrical
service.
Installation will be easier if the vent hood is
installed before the cook-top and countertop are
installed.
Removing the packagingRemoving the packaging
Removing the packagingRemoving the packaging
Removing the packaging
Remove carton carefully, Wear gloves to protect
against sharp edges.
Remove the protective film covering the product
before putting into operation.