Frymaster SM80 Fryer User Manual


 
SUPER MARATHON SERIES GAS FRYERS
CHAPTER 3: INSTALLATION INSTRUCTIONS
3-4
3.3 Leveling the Fryer (cont.)
NOTE: The installation must be inspected after it is complete to ensure it meets the intent of these
instructions. The on-site supervisor and/or operator(s) should be informed that the appliance is
installed with restraints. If restraints are removed to move fryer (cleaning beneath and behind,
relocation, etc.), ensure that they are re-installed when fryer is returned to its permanently installed
position.
DANGER
The fryer MUST be connected to the gas supply specified on the rating and serial number
plate located on the back of the fryer door.
WARNING
If gas odors are detected, the gas supply MUST be shut off at the main shut-off valve. The
local gas company or FASC should be contacted immediately to rectify the problem.
3.4 Gas Connections
CE REQUIREMENTS
Super Marathon Series gas fryers have obtained CE markings for countries and gas categories shown
below:
COUNTRIES CATEGORIES GAS PRESSURE (MBAR)
II2ELL3B/P G20/G25; G30/G31
20
50
GERMANY (DE)
I3P G31 50
AUSTRIA (AT) II2H3B/P G20; G30/G31
20
50
I2E(R)B G20/G25 20/25
BELGIUM (BE)
I3+ G30/G31 28-30/37
DENMARK (DK)
FINLAND (FI)
SWEDEN (SE)
II2H3B/P G20; G30/G31
20
30
SPAIN (ES)
GREECE (GR)
ITALY (IT)
IRELAND (IE)
PORTUGAL (PT)
UNITED KINGDOM (GB)
II2H3+ G20; G30/G31
20
28-30/37
SPAIN (ES) II2H3P
G20; G31
20
37 AND 50
II2Esi3+
G20/G25; G30/G31
20/25
28-30/37
FRANCE (FR)
II2Esi3P
G20/G25; G31
20/25
50
LUXEMBOURG (LU) II2E3B/P G20; G30/G31
20
50
II2L3P G25; G31
25
50
NETHERLANDS (NL)
II2L3B/P G25; G30/G31
25
30