GE JBP79 Range User Manual


 
Installation Instructions
Electrical Connections oo°t.
THREE-WIRE CORD CONNECTION KIT
Grounded
3 _>_._ _ Neutral
Complete 3 Screws _]_ Terminal
wire cord kit. l /_White)
by step sStrraPw
instructions on
how to install
the kit. Connection Relief
Plate Clamp
I-_ Remove the screws on
the terminal block with a
1/4" nut driver or phillips
screwdriver.
Knockout in center
of connection plate
may be taken out
Install the three-wire
cord and strain
relief through the
hole in the
connection plate,
3 wire
_r_ cord kit
Connection _. ,_._
Pla_
] Strain
-_ Relief
Clamp
Connect the outer wires to the outside
terminals and the center wire to the
center terminal. Do not remove the
ground strap
Grounded
Neutral
(White)
Outer
Wire
,.....
Wire Outer
Wire
F_a--i Push the cord upward (to relieve strain),
while tightening the strain relief clamp.
i-_a--i Re-install the wire cover with the 5
screws removed earlier. Make sure the
wires do not become pinched between
the wire cover and mainback.
!
I
i Wire
Cover
Special note: If local codes require an
undgrounded neutral, you must do the
following:
a. Remove ground strap.
b. Fasten the white wire to the center terminal.
c. Use grounding terminal or lead to ground unit
in accordance with local codes.
7