GE JV960 Ventilation Hood User Manual


 
4
INSTALLATION INSTRUCTIONS
This hood can easily be installed by following these
basic steps:
• Mark and cut out the cabinet bottom.
• Secure the hood to the cabinet.
• Mount the cabinet on the wall.
• Connect the ductwork and the power cable.
TOOLS YOU WILL NEED
Flat blade and Phillips
screwdrivers
Pencil
Duct tape
Saw (saber or keyhole)
Electric Drill
Metal Snips
(in some applications)
Pliers
Tape measure
Wire stripper
Flashlight
Caulking
Level
PLAN THE INSTALLATION
Caution: Remove the house fuse or open the
circuit breaker before beginning the installation.
Your new hood will fit a standard 36wide flush bottom
or recessed bottom, framed or frameless kitchen cabinet
which has a minimum depth of 11 from the face to
the inside of the back wall.
The unit is ducted vertically. To change to horizontal
ducting see the instructions.
For safe operation, the mounted hood must be
a minimum of 18above the cooking surface.
For easiest installation, the range hood should be
installed in the cabinet before mounting the cabinet to
the wall.
NOTE: Remove the glass visor from the
unit before installing the hood in the cabinet
to protect the visor from damage.
INSTALL THE HOOD
1. Mark and cut out the cabinet bottom.
Prepare the cabinet bottom as shown above. Be
sure to locate the cut-out and four holes from the
front of the cabinet to assure a flush mount.