GE LMAB1240ST Microwave Oven User Manual


 
5-10
COMPONENTS TEST PROCEDURE RESULTS
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
1
2
3
4
5
6
7
8
9
10
4 sec
6 sec
8 sec
10 sec
12 sec
14 sec
16 sec
18 sec
20 sec
22 sec
18 sec
16 sec
14 sec
12 sec
10 sec
8 sec
6 sec
4 sec
2 sec
0 sec
POWER
LEVEL

Measure the resistance.
(Ohm-meter scale: R x 1)
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 1)
NOTE : A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS SERVICED
FOR ANY REASON.
MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE CONNECTOR,
NOT THE WIRES.
Normal:
A:Approx. 85 ~ 100 ohm.
B:Approx. 10 ~ 25 ohm.
Abnormal: Infinite or several
ohm.
Normal: Approx. 100 ~ 150 ohm
Abnormal: Infinite or several
ohm.