GE PSB2201 Oven User Manual


 
Installation Preparation
6
Preparation WITHOUT an Accessory Storage Drawer
PREPARE THE OPENING (CONT.)
Installation over a GE/Monogram Oven and
Warming Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location do
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
CAUTION: For personal safety, the mounting
surface must be capable of supporting the
cabinet load, in addition to the added weight of
this approximate 80-pound oven, plus additional
oven loads of up to 50 pounds or a total weight
of 130 pounds.
Construct Solid
Bottom Min.
3/8” Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
Per Oven
Requirement
45-1/4”
Min.
Per warming drawer requirement
2” Min.
(3” recommended)
PREPARE THE OPENING (CONT.)
Installation over a GE/Monogram Oven:
• If you are replacing a GE/Monogram electric
double oven with the combined installation of
an Advantium 240V and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2” minimum shown.
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” recommended)
45-1/4”
Min.
Construct Solid
Bottom Min.
3/8” Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
Per Oven
Requirement