GE PVB37 Ventilation Hood User Manual


 
7
Installation Preparation
CLEARANCES
CAUTION: Wall coverings, countertops
and cabinets should withstand 200° heat generated
by any cooktop.
Gas Cooktop Clearances When InstalledElectric Cooktop Clearances When Installed
PARTS SUPPLIED
Open the carton and remove parts package.
Check contents to be sure all pieces are present.
TOOLS AND MATERIALS REQUIRED




REMOVE PACKAGING

set carton aside. The carton can be used as a pad
when changing or adjusting vent direction.
2 Stabilizing Brackets
With Screws
1 Switch Cover Plate
(With selected models)
682Dia39
2" Min. to
Wall When
Installed
2" Min. to
Wall When
Installed
13"
Max.
30"
Min.
18"
Min.
682Dia45
1 Wire and White Connector
(With selected models)
682Dia2
Gas - 6" to 12"
Electric - 2"
Clearance to Side Walls
682Dia40
a
682Dia38a
6" or 12" Min.
to Wall When
Installed
6" or 12" Min.
to Wall When
Installed
13"
Max.
30"
Min.
18"
Min.