GE PVWS930 Range User Manual


 
Installation Instructions
1 0
OPTIONAL ACCESSORIES
1 Ft = 0.3 m
1” = 2.5 cm
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Additional Materials:
•120V 60Hz. 15 or 20 Amp, 2 wire with ground.
Properly grounded branch circuit.
•Strain relief for junction box.
7” round metal duct or 3¼” x 12” rectangular duct, length
to suit installation.
Duct tape
¼” pivoting hex socket
Pencil and
tape measure
Spirit level
Phillips and
Flat blade screwdrivers
Electric drill with
1
/8 and
3
/8 bits
cUL Listed Wire nuts
Hammer
Safety glasses
Metal snips
Flashlight
Pliers
Wire Cutter/Stripper
Saber saw or Key Hole Saw
Ladder
Allen Wrench
Kit 02279 Model PVIG940
extension chimney (H)
Kit 02280 Model PVWG936
extension chimney (H)
Kit 02281 Models PVWS930/936
extension chimney (H)
Ductless Recirculating Kit
Kit 02282 Models PVWS930/936, PVWT936
Carbon Filter + Filtrating Deflector:
Changes Hood from Venting to
Filtrating
Kit 02283 Models PVWG936 , PVIG940
Carbon Filter + Filtrating Deflector +
Rounded transition: Changes Hood from
Venting to
Filtrating
PARTS PROVIDED
Hood canopy with internal blower, grease filters and
lights already installed
Duct covers
Duct Cover support bracket
Transition (may be already installed)
Hardware Packet:
Note: the hardware packet contains several fittings material.
For models PVWS930, PVWS936 and PVWT936, consider
what is listed below ONLY:
Hook with leveling screws x 2
Template
Use, Care and Installation Guide
10 x 60 drywall anchors x 2 (To attach duct cover
support bracket)
6 x 80 screws x 8 + washers x 8 (2 To attach duct cover
support bracket + 6 to attach the hood canopy)
3,5 x 9,5 screws x 6 (2 to attach the transition + 4 to
attach the duct cover)
MODELS PVWS930, PVWS936 AND PVWT936
MIN 34.8”
MAX 48.4”
MIN 36.4”
MAX 52”
MIN 36.4”
MAX 52”