GE SCB1001 Oven User Manual


 
Installation Preparation
PREPARE THE OPENING (CONT.)
Installation over a GE/Monogram
Warming Drawer:
NOTE: Additional clearances between the cutouts may
be required. Check to be sure the oven supports above
the Warming Drawer location does not obstruct the
required interior depth and height. See Warming Drawer
installation instructions for details.
27” or 30”
23-1/2”
25-1/8”
17-1/2”
9-1/4”
36-3/4”
Min.
2” Min.
Install 2 x 4
or 2 x 2
Runners
or Solid
Bottom.
Must
Support
100 lbs.
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported
by 2 x 4 or
1 x 2
Runners all
Four Sides
6
PREPARE THE OPENING
The Advantium 120 can be installed in combination
with other GE/Monogram appliances. Always follow
each product’s Installation Instructions to complete
the installation.
Single Advantium 120 Installation:
Order a 27" or 30" wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
• Always maintain 36-3/4" minimum height from the
floor to the cutout in any single or combined
installation.
• Allow 1-1/4" case trim overlap at the top and 7/8"
overlap on the bottom and each side of the opening.
• Oven overlaps will conceal cut edges on all sides of
the opening.
When installed over a single oven or a warming
drawer, allow at least 2" between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 120 and the other appliance
overlaps.
Construct a solid oven floor of 3/8" min. thick plywood
supported by 2 x 4 runners on all sides.
• The support must be level and rigidly mounted, flush
with the bottom edge of the cutout.
27” or 30”
23-1/2”
25-1/8”
17-1/2”
Construct
Base
Min. 3/8”
Plywood
Supported
by 2 x 4
or 1 x 2
Runners all
Four Sides
36-3/4”
Min.