Installation Instructions
11
STEP 3 INSTALL SIDE PANELS
Skip this step when not using side panels
If you are using 1/4" side panels, they should
be inserted into the case trim.
STEP 1 REMOVE PACKAGING
CAUTION: Product is much heavier
at the top than at the bottom – be careful when moving.
When using a hand truck, handle from side only.
PRUDENCE: Le produit est beaucoup
plus lourd en haut qu’en bas. Il faut être prudent lors
des déplacements. Si un diable est utilisé, il faut soulever
le réfrigérateur sur le côté seulement.
• Carefully cut banding at the top and bottom, remove
outer carton.
• Slide out back corner posts (2).
• Slide carton off top of cabinet.
NOTE: IT IS NOT NECESSARY TO LAY CABINET DOWN
IN ORDER TO REMOVE SKID!
CAUTION:
DO NOT ATTEMPT TO ROLL
UNIT OFF SKID.
PRUDENCE:
IL NE FAUT PAS ESSAYER DE
FAIRE ROULER L’ APPAREIL
MÉNAGER POUR L'ENLEVER
DE LAY PALETTE.
STEP 2 INSTALL WATER LINE
• A cold water supply is required for automatic
icemaker operation. The water pressure must
be between 40 and 120 p.s.i.
• Route 1/4" OD copper or GE SmartConnect
™
plastic tubing between house cold water line
and the water connection location.
• Tubing should be long enough to extend to the front
of the unit. Allow enough tubing to accommodate bend
leading into the water line connection.
NOTE: The only GE approved plastic tubing is supplied
in the GE SmartConnect
™
Refrigerator Tubing kits.
Do not use any other plastic water supply line because
the line is under pressure at all times. Other types
of plastic may crack or rupture with age and cause
water damage to your home.
GE SmartConnect
™
Refrigerator Tubing Kits are
available in the following lengths:
2' (.6 m) WX08X10002
6' (1.8 m) WX08X10006
15' (4.6 m) WX08X10015
25' (7.6 m) WX08X10025
• The unit is secured to the skid with 4 slotted
tie-down straps. Remove the four 5/16" bolts
from the base channels in the tie-downs.
• Remove toekick, custom handle trim, and wall
bracket. Set aside for final installation.
• Lift the unit off the skid with an appliance dolly.
Handle from the sides.
• Remove the four 7/16" bolts securing the tie-down
brackets to the skid.
NOTE: Commonwealth of Massachusetts Plumbing
Codes 248CMR shall be adhered to. Saddle valves are
illegal and use is not permitted in Massachusetts.
Consult with your licensed plumber.
Shut off the main water supply.
Turn on the nearest faucet long enough to clear the line
of water.
• Install a shut-off valve between the icemaker water
valve and cold water pipe in a basement or cabinet.
The shut-off valve should be located where it will
be easily accessible.
• Turn on the main water supply and flush debris.
Run about a quart of water through the tubing into
a bucket. Shut off water supply at the shut-off valve.
NOTE: Saddle type shut-off valves are included in many
water supply kits. Before purchasing, make sure a saddle
type valve complies with your local plumbing codes.
Fasten the panels to the unit with stick-on hook and
loop fastener strips before setting unit in place.
CAUTION: DO NOT lay this unit on its back.
PRUDENCE: NE PAS mettre cet appareil
ménager sur son dos.