GE Monogram ZBD6700 Dishwasher User Manual


 
Installation Preparation
MATERIALS YOU WILL NEED:
Materials Required for All Installations
90° Elbow (3/8”NPT external thread on one end, opposite
end sized to fit water supply)
Note: Use new ferrule. Do not use old parts.
Strain relief for electrical connection
Thread seal tape
UL Listed wire connectors (3)
Screw type hose clamps
Materials For New Installations Only:
Air gap for drain hose, if required
Waste tee for house plumbing, if applicable
Electrical cable or power cord, if applicable
Hand shut-off valve (recommended)
Water line 3/8” min. copper or 1/2” min. plastic (plastic
must be tested for temperature and pressure)
Coupler for extending drain line, if applicable
4
90° Elbow
Thread Seal
Tape
Wire Nuts
Screw Type Clamps
Waste Tee
Shut-Off
Valve
Electrical Cable
or Power Cord
Air
Gap
Coupler
Hot Water Line
TOOLS YOU WILL NEED:
Tools Required for All Installations
Phillips head and flat blade screwdrivers
3/8”, 5/16” and 1/4” nutdrivers
Level
Carpenters square
Measuring tape
Safety glasses
Flashlight
Bucket to catch water when flushing the line
Tubing cutter
Gloves to protect against sharp edges
Wire strippers
For New Installations Only:
Drill and appropriate bits
Hole saw set
Flat Blade Screwdriver
Flashlight
Bucket
Level
Phillips Head
Screwdriver
Safety Glasses
Hole
Saw Set
Square
Tubing
Cutter
Adjustable
Wrench
Measuring Tape
Gloves
Nut Driver
Drill
and Bits
Strain Relief
Wire Strippers