GE Monogram ZSC2201 Oven User Manual


 
Installation Preparation
7
Preparation WITHOUT an Accessory Storage Drawer
PREPARE THE OPENING (CONT.)
Installation over a GE/Monogram Oven and
Warming Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location do
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
CAUTION: For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate 80-pound oven, plus additional
oven loads of up to 50 pounds or a total weight
of 130 pounds.
PRECAUCIÓN: Para seguridad
personal, la superficie de montaje debe poder
soportar la carga del gabinete, además del peso
aproximado de 80 libras del horno, más las
cargas adicionales del horno de hasta 50 libras
o un peso total de hasta 130 libras.
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
Per Oven
Requirement
45-1/4”
Min.
Per warming drawer requirement
2” Min.
(3” recommended)
PREPARE THE OPENING (CONT.)
Installation over a GE/Monogram Oven:
,I\RXDUHUHSODFLQJD*(0RQRJUDPHOHFWULF
double oven with the combined installation of
an Advantium 240V and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2” minimum shown.
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” recommended)
45-1/4”
Min.
Construct Solid
Bottom Min.
3/8” Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
Per Oven
Requirement