GE Monogram ZXR859 Ventilation Hood User Manual


 
Installation Instructions
7
3
INSTALL LOWER SUPPORT FRAME
• Insert lower support frame (from required accessory
ZXR858, ZXR859 or ZXR8510) into the upper
support frame and loosely secure with 8 screws and
washers (4 on the front and 4 on the back sides).
• Adjust the lower support frame up or down to the
desired height above the countertop. Tighten screws.
2
INSTALL UPPER SUPPORT FRAME
• Install the plastic upper duct connector to the
upper support frame by inserting from the bottom
and snapping into the opening of the air deflector
(already installed).
• Secure the upper support frame to the ceiling joists
and/or cross framing with the 4 screws provided.
For maximum rigidity and strength, the screws must
be driven into the center of the joists and/or cross
framing.
• Check to be sure the support frame is level,
vertically and horizontally.
Important: Again, check to be sure the support is
level in both directions. There is no way to level the
hood after the hood is secured to the frame.
25-1/2" Recommended
13-5/8
*39-1/8"
Countertop
Hood
Mounting
Flange
Lower Support
**75-1/8"
to Floor
*Note:
39-1/8” to top of hood flange can be increased up to
42” max.
**75-1/8” min to floor, 77-7/8” max.
Support
Frame
Opening
Upper
Support
Frame
Lower
Support
Frame
Check Level in
Both Direction
Front
Of
Hood
Air
Deflector
Plastic Upper
Duct Connector