Halsey Taylor OVL-II SER-Q Water Dispenser User Manual


 
4
OVLERQ*C OVLSRQ*C OVLESRQ*F OVLSERQ*F
97793C - 10/01
Figure 6  OVL-II SER-Q Rough-In
Figure 7  Rough-In Assembly
Dual-Station Mounting Frames
Models
OVL-II SER-Q  OVL-II ESR-Q
1. Cut a rectangular wall opening 37-1/2 (953 mm) W x
37-3/4 H (959 mm) and 4-1/2 (114 mm) above the
floor line (see Figure 7). The dimensions are required
to obtain proper rim and bubbler heights for
compliance with ANSI standard A117.1.
2. Reinforce the wall opening on all sides to adequately
support the water fountain. This reinforcement must
support up to 150 lbs. static load and provide a
means for securing the frame assembly in place.
NOTE: Building construction must allow for
adequate air flow on both sides and top of
remote chiller unit a minimum of 4 (102
mm) is required.
3. Install plumbing and electrical rough-ins. A junction
box for a (3) wire, 10 amp branch circuit is provided on
the inside of the chiller. (Standard 120 Volts, 60 Hz,
and single phase.)
4. Remove frames and related hardware from
packaging. Release the two shelf rods by cutting
cable ties. Attach the two frames together through the
upright supports with (4) 5/16 x 3/4 (19 mm) long
bolts and nuts (not provided). Tighten securely.
REVERSED CONFIGURATION:
HIGHER UNIT ON THE RIGHT
MAKE SURE FRAME CONFIGURATION MATCHES
THE COOLER TO BE INSTALLED
STANDARD CONFIGURATION:
HIGHER UNIT ON THE LEFT