Installation
Levelling:
Level the fridge freezer when it is in its final location by adjusting the front feet, until
firm contact is made with the floor. This will stop rocking or vibration and keep the
door aligned which helps the fridge freezer run reliably and efficiently.
Note: Before plugging in and switching on, leave the fridge freezer standing
in its final location for at least 15 minutes to allow it to settle.
4
SAFETY &
INSTALLATION
Bottle Retainer:
To fit the bottle rack retainer:
Locate the retainer groove at one end of the bottle rack and
then gradually press down along the top edge until the
retainer is fully in the home position.
WARNING: Failure to level the appliance correctly may result in misalignment of the
cabinet and/or doors.