Installation
Levelling:
Level the fridge freezer when it is in its final location by adjusting the front feet,until
firm contact is made with the floor. This will stop rocking or vibration and keep the
doors aligned which helps the fridge freezer run reliably and efficiently.
Note: Before plugging in and switching on, leave the fridge freezer standing
in its final location for at least 15 minutes to allow it to settle.
4
SAFETY &
INSTALLATION
Defrost Tube:
A tube is supplied to help feed defrost water into a collecting vessel, ie. a bowl (see
‘Defrosting’in the CLEANING & MAINTENANCE section).
For safe keeping until required,the tube can be stored in the floor of the freezer
compartment.
To fit the bottle rack retainer:
Locate the retainer groove at one end of
the bottle rack and then gradually press
down along the top edge until the
retainer is fully in the home position.
Bottle Retainer (not applicable to all models):
WARNING: Failure to level the appliance correctly may result in misalignment
of the cabinet and/or doors.
Floor of the freezer compartment
Defrost tube in storage position