Jenn-Air LI3U2B Ventilation Hood User Manual


 
8
Make Electrical Connection
1. Disconnect power.
2. Remove terminal box cover.
3. Remove the knockout in the terminal box cover and install a
UL listed or CSA approved ¹⁄₂" strain relief.
4. Run 3 wires, black, white and green (14AWG), in ¹⁄₂" conduit
from service panel to terminal box. Use caulking to seal
opening.
5. Use UL listed wire connectors and connect black wires (D)
together.
6. Use UL listed wire connectors and connect white wires (F)
together
.
7. Connect green (or bare) ground wire from home power supply
to yellow-green ground wire (E) in terminal box using UL listed
wire connectors.
8. Tighten strain relief screw.
9. Install terminal box cover.
10. Check all light bulbs are secure in their sockets.
11. Reconnect power.
Install Duct Covers
1. Attach the vertical duct cover supports using 4 - 4 x 8 mm
screws.
2. Slide upper duct covers into place until springs “click.”
A. UL listed or CSA approved strain relief
B.Home power supply cable
C. Terminal box
D. Black wires
E.Green (or bare) wire connected to yellow-green wire
F. White wires
WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
B
A
C
D
E
F
A. Screws
B. Vertical duct cover support
A. Upper duct cover
B. Spring
WARNING
Electrical Shock Hazard
Electrically ground blower.
Connect ground wire to green and yellow ground wire
in terminal box.
Failure to do so can result in death or electrical shock.
B
A
A
B
A