KitchenAid KWE-200 Garbage Disposal User Manual


 
HEAVY DUTY DISPOSERS
MODELS KWE-200, KWI-200,
KWD-2C0, 8 KWS-200
INSTALLATION INSTRUCTIONS
INSTALLER: FINAL CHECK LIST
GENERAL
0 1. Remove unit from carton and check for shipping damage.
0 2. Sink flange assembled in center of drain opening and flange seals in place
to assure a water tight seal.
0 3. Disposer level - not installed at an angle.
PLUMBING
0 1. If installed in old house, existing drain line from sink to sewer cleaned.
0
2. Long, horizontal drain lines eliminated.
0
3. Drum traps and grease traps should not be used.
0
4. Seal at drain spout properly positioned.
0
5. Center line height of drain line must not exceed center line height of
disposer discharge opening.
0
6. Mounting screws and spout screws properly tightened to prevent leaks.
0 7. Compliance with all aspects of local plumbing code.
ELECTRICAL CONNECTION
0
1. Properly fused, 115 volt, 60 hertz branch circuit of 15 ampere capacity.
0
2. Disposer properly grounded before operating.
0
3. All connections must comply with the National Electrical Code and/or
local electrical code.
OPERATIONAL
0
1. Before operating, check to assure grind chamber is free of any foreign
objects.
0
2. Activate disposer -test for grinding performance and water leaks.
THANK YOU INSTALLER:
1. Complete Installation Check List.
2. Leave all literature (including Check List) for customer.
3. Notify dealer that electrical work and plumbing are completed,