Kobe Range Hoods CH0042SQB Ventilation Hood User Manual


 
11
Duct Cover Installation
5. Use 8” round steel pipe (follow building codes in
your area) to connect the ducting transition on
the hood to the ductwork above.
Use duct tape
to make all joints secure and air tight.
Refer
Figure 15. Slide the duct cover onto the hood.
6. Use 3/16” x 3/8” screws (included) to attach duct
cover to hood.
Figure 15
Final Assembly
CAUTION: Install heating lamps last.
7. Drop oil tunnel into recess support near rear of
hood. Refer to Figure 16.
8. Install baffle filters and stainless spacer(s).
Refer to Measurements and Diagrams on page
21 for baffle filter and stainless spacer placement.
Angle baffle filter toward back of hood . Push
baffle filter up until almost level . Slide forward
into recess behind the front of hood . Lower
baffle filter . Slide back until it fits into resting
position .Angle baffle filter toward back of hood
. Refer to Figure 17.
9. Repeat for all baffle filters and spacers.
10. Install heating lamps (not included), 120 Volts
175 Watts max. each.
11. Turn power ON in control panel. Check all
lights and fan operation.
12. Make sure to leave this manual for the
homeowner.
Figure 16
Figure 17