Kobe Range Hoods CH0142SQB Ventilation Hood User Manual


 
11
Duct Cover Installation
5. Use 8” aluminum or steel pipe (follow building
codes in your area) to connect the ducting
transition on the hood to the ductwork above.
Use duct tape to seal and secure joints as shown
in Figure 15. Slide the duct cover onto the hood.
6. Use 3/16” x 3/8” screws (provided) to attach duct
cover to hood.
Figure 15
Final Assembly
CAUTION: Install heating lamps last.
7. Drop Oil Tunnel into support structure. Refer to
Figure 7.
8. Angle baffle filter toward back of hood
. Refer
to Figure 8.
9. Push baffle filter up until almost level
.
10. Slide forward into recess at front of hood
.
11. Lower baffle filter
and slide back until it fits into
resting position
.
12. Repeat for all baffle filters and spacers. Refer to
Measurements and Diagrams on page 21 for
baffle filter and stainless spacer arrangement.
13. Install heating lamps (not provided), 120 Volts
250 Watts max. each.
14. Turn power ON in control panel. Check all
lights and fan operation.
15. Make sure to leave this manual for the
homeowner.
Figure 16
Figure 17