Kobe Range Hoods CH7942SQB Ventilation Hood User Manual


 
8
2. If necessary, arrange the electrical wires to run through the 1” diameter hole on the top or
the rear of the hood. Refer to Figure 5.
Hood Installation
CAUTION: If required to move the cooking range to install the hood, turn off the power on an
electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS
RANGE.
1. Puncture the knockout holes on the hood as shown in Figure 4.
3. Using references on Table 1 and measurements on Page 22 to center the hood in place
beneath the cabinet and flush with the front of the cabinet.
1" Diameter
Hole
Figure 4 Figure 5
4. Draw electrical wires through cabinet access opening.
5. Place screw (not provided) into the exact center of each knockout hole. Make sure all
screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.
6. Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork
above. Use duct tape to make all joints secure and air tight.
Ductwork Installation