Kobe Range Hoods CH9630SQB Ventilation Hood User Manual


 
10
1. Using references in TABLE 1 and
Measurements and Diagrams on pages 19-21,
mark the leveling point of the hood. Position
two mounting screws (not provided) on the
wall, leaving 1/8” space away from the wall.
2. Puncture the knockout wire access hole at
the back of the hood and draw the electrical
wires through as shown in Figure 12.
3. Align hood-mounting bracket to the screws on
the wall and hook hood into place as shown in
Figure 13. Tighten screws to secure hood to
the wall.
4. For safety purpose, pre-drilled mounting holes
are provided through the back of the hood.
For a more secure installation, use as many
mounting holes as needed to secure from the
inside of hood (screws not provided).
CAUTION
: MAKE SURE HOOD IS
SECURE BEFORE RELEASING.
Wiring to Power Supply
SAFETY WARNING
RISK OF ELECTRICAL SHOCK. THIS RANGE
HOOD MUST BE PROPERLY GROUNDED.
MAKE SURE THIS IS DONE BY QUALIFIED
ELECTRICIAN IN ACCORDANCE WITH ALL
APPLICABLE NATIONAL AND LOCAL
ELECTRICAL CODES. BEFORE
CONNECTING WIRES, SWITCH POWER OFF
AT SERVICE PANEL AND LOCK SERVICE
PANEL TO PREVENT
POWER FROM BEING
SWITCHED ON ACCIDENTALLY.
5. Connect the electrical wires.
-
Connect three wires (black, white and
green) to house wires and cap with wire
connectors. Connect according to color:
black to black, white to white, and green
to green as shown on Figure 14.
-
Store wires in the wiring box.
Figure 12
Figure 13
Figure 14
WALL