Kobe Range Hoods IS2336SQ Ventilation Hood User Manual


 
4
INSTALLATION
PLEASE READ ENTIRE INSTRUCTIONS BEFORE PROCEEDING
Calculation before Installations
To calculate the length of the installation, please refer to Table 1. (All calculation is measure in
inches.)
TABLE 1
A = Height of Floor to Ceiling
B = Height of Floor to Counter Top
(Standard: 36”)
C = Preferred Height of Counter Top
to Hood Bottom (Recommended
30” to 36”)
D = Height of Hood
E = Height of the Hood Installation
[A – (B+C)]
F = Height of Duct Cover
[E – D]
S AF ET Y W A R N IN G
HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF IT
IS NECESSARY TO REMOVE ANY PARTS FOR INSTALLING, CLEANING OR
SERVICING.
Preparations of Ductwork and Location
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
- Decide the location of the venting pipe from the hood to the outside. Refer to Figure 1.
- A straight, short venting run will allow the hood to perform more efficiently.
- Try to avoid as many transitions, elbows, and long run as possible. This may reduce the
performance of the hood.
- Use duct tape to seal the joints between pipe sections.
Figure 1