Kobe Range Hoods RA0248SQB Ventilation Hood User Manual


 
7
Hood Installation
CAUTION: If required to move the
cooking range to install the hood, turn off
the power on an electric range at the main
electrical box. SHUT OFF THE GAS
BEFORE MOVING A GAS RANGE.
1. Using references in Table 1 and
measurements on Page 5, mark the leveling
locations point for hood-mounting bracket on
the wall.
2. Secure two mounting screws (not provided) to
the wall, leaving an 1/8” space from the wall.
(Figure 5)
3. Align the hood-mounting bracket to the
mounting screws on the wall and hang hood
into place.
4. Secure and tighten the mounting screws.
CAUTION: MAKE SURE HOOD IS
SECURE BEFORE RELEASING.
Wiring to Power Supply
SAFETY WARNING
RISK OF ELECTRICAL SHOCK. THIS RANGE
HOOD MUST BE PROPERLY GROUNDED.
MAKE SURE THIS IS DONE BY SPECIALIZED
ELECTRICIAN IN ACCORDANCE WITH ALL
APPLICABLE NATIONAL AND LOCAL
ELECTRICAL CODES. BEFORE CONNECTING
WIRES, SWITCH POWER OFF AT SERVICE
PANEL AND LOCK SERVICE PANEL TO
PREVENT POWER FROM BEING SWITCHED
ON ACCIDENTALLY.
5. Connect the electrical wires.
-
Connect three wires (black, white and
green) to house wires and cap with wire
connectors. Connect according to color:
black to black, white to white, and green to
green as shown on Figure 6.
-
If necessary to hide the electrical wire
connections, push wires back into the
wiring box. Access the wire connections
underneath the hood. Make sure wires do
not slip between motor or any moving parts
to prevent any damage.
Figure 5
Figure 6
Figure 7