Lang Manufacturing LG-36S Griddle User Manual


 
7
START-UPS
ELECTRIC GRIDDLES
Electric Griddle Start-Up
1) Verify connections at plug and terminal block
2) Incoming Volt - Single Phase L1-L2______
Three Phase L1-L2______ L2-L3______ L3-L1______
3) Amp draw L1______
L2______
L3______
6) Verify actual temperature at 350 °F ________ °F.
Note: Install thermocouple wire in center of 12 section for that control area.
Let griddle cycle off and on 3 times before recording temperature.
Model #_______ Date_______ Serial #________
Store #___________ Tech Name___________________
Contact_______________ Company _________________________
Store Phone #___________ Service Company Phone #______________
Address_____________________
______________________
______________________