A. Install new insulation (supplied).
B. Attach tube to dump valve.
C. Attach 90 barbed elbow (supplied) to other end of tube and clamp (supplied).
D. Attach other end of 90 barbed elbow to white distribution tube.
11. Reinstall water pump.
A. Attach white distribution tube to water pump.
B. Plug water pump into bulkhead plug.
C. Screw water pump to new holes in bulkhead.
12. Install front splash shield (supplied).
A. Slide splash shield down in front of trough so slanted bottom of splash shield is under trough.
B. Use right-hand and left-hand slots in splash shield as a guide to mark for drilling.
C. Drill two 5/32" diameter holes and mount splash shield with screws (supplied).
13. Check the following:
A. Water curtains open freely.
B. Float on float valve moves freely.
C. Water tubes not kinked.
D. Water level in trough.
14. Reinstall front panel.
Manitowoc Ice, Inc.
8009913
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA Sheet 2 of 2
Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879 Rev. 10/06/98