Marvel Industries 6ORDE Refrigerator User Manual


 
FULL OVERLAY PANEL INSTALLATION INSTRUCTIONS
5
Step 3: Size the Overlay Panel Step 6: Reinstall the Drawers
Fully extend drawer slides and place drawer on slides. 1.
Be sure that drawer sits evenly on both slides.
Lock drawers into drawer slides. Push drawer locks 2.
down and then back to relock the drawer into the slide.
Step 7: Adjust Drawer Front
Adjust drawer front to achieve a 1/8 inch gap from the 1.
top of the drawer front to the top of the cabinet or (for
bottom drawers) 1/8 inch from the top of the drawer
front to the bottom of the top drawer, the drawer front
should be centered betweent he cabinet edges.
Fully tighten Phillips head screws to complete overlay 2.
panel installation.
Step 4: Attach the Overlay Panel to the Door
Set the overlay panel on drawer front face and align 1.
edges. Clamp panel in position and mark pilot hole
locations. See Step 3 for nominal size and hole loca-
tions. Drill pilot holes. Remove panel if necessary,
then realign and reclamp overlay to drawer face.
Insert wood screws through clearance holes and 2.
tighten to secure ovelay panel.
Reinstall gasket into channel. Make sure the corners 3.
are fully inserted.
Step 5: Reattach Drawer Front to Drawer Body
Align mounting holes on drawer body with mounting 1.
holes on drawer front. Align the door liner to the front
flanges by using the erasable marker alignment lines
that were applied prior to removing the door from the
drawer in Step 2. Reinstall Phillips head screws and
washers. Snug down, but do not tighten fully; final
adjustment of drawer front will be done after reinstall-
ing the drawer.
Figure 7