NuTone ssQTXe080 Ventilation Hood User Manual


 
MODELS SSQTXE080 • SSQTXE110
Page 1
WARNING
Broan SmartSense
®
Intelligent Ventilation System
R E A D A N D S AV E T H E S E I N S T R U C T I O N S
TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO
PERSONS, OBSERVE THE FOLLOWING:
1. Use this unit only in the manner intended by the
manufacturer. If you have questions, contact the
manufacturer at the address or telephone number listed in
the warranty.
2. Before servicing or cleaning unit, switch power off at
service panel and lock the service disconnecting means
to prevent power from being switched on accidentally.
When the service disconnecting means cannot be locked,
securely fasten a prominent warning device, such as a tag,
to the service panel.
3. Installation work and electrical wiring must be done by a
qualified person(s) in accordance with all applicable codes
and standards, including fire-rated construction codes and
standards.
4. Sufficient air is needed for proper combustion and
exhausting of gases through the flue (chimney) of fuel
burning equipment to prevent backdrafting. Follow the
heating equipment manufacturer’s guideline and safety
standards such as those published by the National Fire
Protection Association (NFPA), and the American Society
for Heating, Refrigeration and Air Conditioning Engineers
(ASHRAE), and the local code authorities.
5. When cutting or drilling into wall or ceiling, do not damage
electrical wiring and other hidden utilities.
6. This unit must be grounded.
7. Do not connect this product as a load on a fan speed
control or light dimmer.
8. Read and understand entire instructions before proceeding
with installation.
INSTALLATION
Install controls and wire them as shown. Use following
guidelines:
IMPORTANT:
QTXE080 Ultra Silent™ fan must be wired to SMSC080
SmartSense
®
control.
QTXE110 Ultra Silent™ fan must be wired to SMSC110
SmartSense
®
control.
Use minimum 75 °C rated electrical wiring.
Except for required neutral wire, these controls install
like normal switches. Make sure electrician knows each
control location must have a neutral wire. Neutral wire
at switch locations may be code requirement or regular
practice in installation municipality; but unless explicitly
specified, electrician might not install it.
Specify deep device electrical boxes where controls will
be installed. These controls fit in most North American
electrical boxes; however, deep boxes provide extra
working space which eases installation. Labor cost
savings can offset higher box costs, which is usually
less than a dollar over standard depth boxes. Use boxes
that have 18 cu. in. minimum volume and are at least
1-1/2 in. deep.
All controls must be grounded using attached ground wire.
LINE
Black
NEUTRAL
White
LINE
Black
NEUTRAL
White
GROUND
Bare
Copper
GROUND
Green
WHITE
BLACK
CONTROL
FAN
LOAD
Red
GROUND
Bare
Copper
POWER
LINE
(GFCI
protected
if required)